Container film mass testing defects

The quality of container coating film is related to many factors. To obtain a coating film of different quality, it is necessary to have qualified surface treatment quality, good quality coating, correct coating process, and familiar coating technology. The quality management of container coating is a systematic project, which includes the establishment of quality requirements, quality inspection, quality information feedback and processing, and coating maintenance after completion.

The quality of the coating film is the use value of the coating film: the quality of film removal is the product reputation of the container coating factory. Therefore, container owners, container manufacturers, and coating suppliers all place an important position on improving the quality of the container coating film.


The quality of container coating film includes two aspects: the surface quality of the legal film and the quality of the film thickness:

Painted Surface Quality

The surface quality of the paint film is the appearance quality. The paint film of the shop primer should be free of defects such as spray leakage, blistering, whitening, stickiness, and peeling off. It reflects the internal quality of the shop primer and the process conditions to a certain extent. Good or bad. If the coating film of the shop primer has obvious streaky dripping spray, the walking speed of the nozzle and the steel plate should be adjusted; if the coating film of the shop primer cannot be dried in time, when the steel plates are stacked, the coating film will stick and fall off (relevant equipment: attached force Tester), so it is necessary to select a suitable thinner (such as winter thinner), a suitable nozzle aperture, or increase the temperature of the general room, slow down the transmission speed of the steel plate, etc., so that the steel plate can be shipped smoothly. In actual production, in order to understand Whether the shop primer applied by the steel plate pretreatment machine is uniform, you can stick a smooth, transparent glass plate or plastic plate on the steel plate, and you can also check whether there is flow on the pretreatment machine.

The surface quality of the container paint film reflects the internal quality of the container coating to a large extent, reflects the quality of the coating construction, and has an important impact on the exterior decoration and anti-corrosion life of the container.

For the left and right side panels, front end panels, door panels and roof panels (both including the inside) of the container, the surface of the coating film should:

(1) No coating defects such as sagging, spray leakage, pinholes, spontaneous, foaming, and _ knot holes;

(2) The surface color should be consistent with the specified color, generally indicated by lu and L Color Charts;

(3) Glossy surface, no dry paint base particles. (Related instrument: gloss meter)

The surface of the asphalt paint on the bottom of the tank shall:

(1) No obvious sag and structure phenomenon;

(2) No floor spray, peeling and cracks;

(3) The surface is in the shape of "fish scale spots".

The quality inspector of the box factory should record the quality of the damaged surface in the checklist, and at the same time reflect the defects of the coating film to the relevant departments, so as to "prescribe the right medicine" and take active measures to improve the quality of the coating film, compared with ship paint. The construction period of container coating is short, and most of them are assembly line operations. It takes up to 2 days from the shot blasting and shop primer to the completion of asphalt paint spraying; It is a supporting product of the same paint company; the company's technical personnel insist on being on site, and will solve problems in time when they find out. Therefore, many disadvantages on the surface of container removal film such as "wrinkled skin", "bottom bite" and "bleeding" , "Blistering" and so on will hardly occur. Like "sagging", " whitening " and "pinhole" etc. For the second disease, analyze the causes and propose preventive measures. (Related instruments: Sag Tester)