project | Quality situation | ||||||||||||||||
master control item head | 1 | Before spraying or applying primer, the surface dust, rust, welding slag, oil, etc. need to be cleaned. | all cleaned up | ||||||||||||||
2 | The variety of paint, the number of coats, and the marks must meet the design requirements or construction specifications. | All meet the design requirements and construction specifications | |||||||||||||||
base Book item head | project | Quality situation | grade | ||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | ||||||||
1 | oil film | √ | √ | √ | √ | √ | √ | √ | о | √ | √ | excellent | |||||
2 | Part paint | √ | √ | √ | √ | √ | о | √ | √ | √ | √ | excellent | |||||
3 | Anticorrosion (painting) of supports, hangers and brackets | √ | √ | о | √ | √ | √ | √ | √ | √ | √ | excellent | |||||
test result | Guaranteed items | All meet the design requirements and specifications | |||||||||||||||
basic items | Check 3 items, 3 of which are excellent, and the excellent and good rate is 100% | ||||||||||||||||
rating | Engineering person in charge: Foreman: Team leader: | nuclear Certainly wait class | excellent QA inspector: | ||||||||||||||
