Analysis on the blending method of waterborne epoxy floor topcoat

Water-based epoxy flooring uses water as a solvent and has no irritating odor. After the flooring is constructed, the paint film can permeate water vapor, so it is suitable for decoration on the first floor or basement floor without a waterproof layer. There are two types of topcoats for water-based epoxy floors, which are 15% and 25% water (the ratio of water to the weight of the material).

1. Water-based epoxy floor topcoat: add 15% water.

      1. First of all, the topcoat of the water-based epoxy floor needs to be proportioned strictly according to the weight ratio of 4:1, and fully stirred with a stirrer to make the material emulsify evenly. Before adding water, the material needs to be emulsified for more than 3 minutes.

      2. Then, it is necessary to add water for the first time, first add 2%, you can slowly add water while stirring, and the addition of water and stirring need to be carried out synchronously.

      3. Next, add water for the second time, add 3%, and stir evenly.

      4. Add 10% water for the last time, and then stir evenly.

      In this way, the top coat of the water-based epoxy floor is prepared, and it can enter the construction process of the floor paint.

2. Water-based epoxy floor topcoat: add 25% water.

      1. First, mix, stir and emulsify the topcoat of the water-based epoxy floor, which is the same as the first small point in a large point.

      2. Then, add water for the first, second, and third times, respectively 2%, 3% and 10%, which is the same as adding water for the third time in a large point. You must add water slowly while stirring. Adding water and stirring need to be done at the same time. step by step.

      3. Add water for the fourth time, that is, add water for the last time, add 10%, and stir evenly. Then you can use a professional roller for even brushing.

      The above are the two preparation methods of water-based epoxy floor paint ingredients. NBCHAO reminds you: each time you add water, you need to stir for a period of time before adding water for the next time. Each time the stirring is not less than 1 minute. After deployment, the epoxy floor material needs to be used up within 30 minutes.