Preparation Process of Waterborne Epoxy Floor coatings

1. Add the water-based epoxy curing agent GCA01, water and a small amount of foam suppressor into the barrel, and stir until the water-based epoxy curing agent GCA01 dissolves evenly;

2. Add titanium dioxide and various pigments and fillers at medium speed, disperse at high speed for 10 minutes, and then sand mill until the fineness is less than 50um;

3. After filtering, slowly add the water-based epoxy curing agent GCA01 at a medium speed, and then stir for 15 minutes after adding;

4. Use a thickener to adjust the viscosity of the paint, and add a defoamer at a low speed, stir for 5 minutes before packaging.

NBCHAO E-shop
Relevant knowledge