How much do you know about the debugging steps of the Moisture Meter? Today, the editor will discuss with you here. Now, please join us to look at the following content:
1. Handle the electrolytic cell: gently shake the electrolytic cell of the Moisture Meter a few times, so that the water on the inner wall of the cell bottle is fully absorbed by the electrolyte, then put the electrolytic cell into the holder, turn on the stirring switch, and adjust the stirring speed , so that the liquid surface forms a small vortex; insert the measuring electrode plug and the electrolytic electrode plug into the corresponding socket of the host, and make them in good contact, and turn on the electrolytic switch.
2. Adjust the balance of the electrolyte: If the electrolytic cell is still in the state of deep iodine, use a 50ul sampler to extract 10ul of distilled water each time, wipe the needle with filter paper, press the start button, and pass through the hole in the middle of the sampling cock. Inject once below the liquid level of the electrolytic cell, inject at any time and observe the color change of the electrolyte at any time, until the electrolyte turns light yellow, the green light of the measurement signal light and the electrolysis signal light indicate, and the counter starts counting. After the counting stops, stop stirring again, pick up the electrolytic cell and shake it gently for a few times, so that the water on the inner wall of the cell bottle is absorbed again, and the calibration can be carried out after the end point alarm.
For the above information, if you are interested, welcome to visit our company, I believe it will help your choice!
