When it comes to the correct way to maintain the thermal shock Test Chamber, it is not comprehensive enough, so we have collated and collected many methods and experiences for the "Maintenance Personnel Reference". It teaches you to maintain the thermal shock Test Chamber correctly, which can effectively extend the service life of the thermal shock Test Chamber and reduce the failure rate of the thermal shock Test Chamber, thus reducing the time and money wasted in maintenance and repair, and creating greater benefits for the company economic benefits.

Matters needing attention in the thermal shock Test Chamber:
1. The cold and heat shock Test Chamber should be fixed, and the condenser should be cleaned every 3 months: for an air-cooled refrigeration system, the condenser fan should be repaired regularly, and the condenser should be sterilized to ensure its good ventilation and heat transfer performance; For the cooling system using water cooling, in addition to ensuring that the water pressure and water temperature are within the specified range, it is also necessary to ensure the corresponding flow rate, and regularly clean the condenser to remove scale, so as to obtain its continuous heat transfer performance.
2. The evaporator of the thermal shock Test Chamber should be cleaned regularly: due to the different cleanliness of the samples, under the forced air circulation, the evaporator will condense a lot of dust and other small particles, and it should be cleaned regularly.
3. If the water is not flowing smoothly, the humidifier will easily cause the humidifier to burn dry due to Graduation, which may damage the humidifier. Therefore, it is necessary to clean the water and the humidifier regularly.
4. If the high-low Temperature Test Chamber is kept at low temperature for a long time, when a cycle is completed, the temperature should be set at 110 degrees, and the small-scale door should be defrosted for two hours. At the same time, you should stick to each test, set the temperature near the ambient temperature, work for about 30 minutes, then cut off the power, and clean the walls of the studio.
5. If the cold and heat shock Test Chamber is not used for a long time, it should be powered on regularly every half a month, and the power-on time should not be less than 1 hour, and the relevant parts of the equipment should be checked for normal operation.