The salt spray test is specially designed for the surface of various materials. After anti-corrosion treatment such as paint, baking varnish, electroplating, anodic oxidation, anti-rust oil, etc., the corrosion resistance of the product is tested. Widely used in hardware, electroplating, electronics, chemical industry, automobile, aerospace, aerospace, communication and other industries. It simulates the corrosion of marine materials in product materials and coatings, analyzing the performance of samples under specific environmental conditions. and evaluation.
Installation and pre-test preparation of salt spray testing machine
●When installing the equipment, pay attention to adjust the height of each foot to keep the equipment level. At the installation site, attention should be paid to the space required for equipment operation, maintenance and repair. Try to install it near the window to facilitate the defogging of the fog Tester.
●The installation location of the machine should avoid direct sunlight, so as not to affect the test conditions.
●The machine should be installed as close as possible to other electrical equipment, precision instruments or flammable materials to avoid danger.
●Keep the surrounding environment clean and tidy, where you will park this salt spray chamber.
●Prepare an Air Compressor with a power of 2.2KW (3HP) or more, connect a gas pipe with a diameter of 8mm, and insert the quick-connect valve of the back pressure regulating valve of the salt spray machine. Observe the pressure of the back pressure regulating valve to ensure that the pressure is 2kg/cm2. If conditions permit, please connect an oil-water separator to ensure the purity of the gas source.
●The spray pressure is kept at 1kg/cm2, which is the pressure of the pre-regulator (need to be displayed in the spray state).
Pressure regulating valve and pressure gauge: front pressure regulating valve and pressure gauge, the inner ring pressure is adjusted to number 1
●Prepare enough purified water or distilled water. Salt spray machine Test Chambers, pressure chambers, salt Water Tanks and sealed Water Tanks need to be filled with water. The Test Chamber, pressure tank and sealed Water Tank are all filled with pure water. The whole salt spray test machine only has salt water. The chamber needs to be filled with the prepared saline test solution. water preparation
●Salt spray machine is a very important part. Be sure to connect the supplied atomizing pipe to the outside, or prepare a suitable exhaust pipe (non-metallic material). The diameter of the fog is 50mm. The installation should be parallel or downward. Do not install coils or U-pipes. This may cause the salt mist to not be removed, affecting test results.
●Fog discharge port: to discharge mist, please be sure to connect to the outside as required.
Salt spray Test Chamber work
●Insert the prepared air source into the back pressure regulator of the salt spray machine and adjust the pressure to 2kg/cm2. Gas source connection
●Add clean water to the test room: turn on the power and observe the low water level indicator in the test room (the low water level indicator on the left side of the panel). If the indicator light is on, it means that the Test Chamber is short of water. please add water
●Open the upper cover of the salt spray chamber, and pour the prepared pure water into the chamber directly until the low water level indicator light in the Test Chamber goes out (indicating that the water level in the Test Chamber is full). Be careful not to spill water into the brine preheating tank when adding water. (located below the spray tower).
●Adding water to the pressure tank: Pay attention to the low water level indicator on the pressure tank (the low water level indicator on the right side of the panel). If the indicator light is on, it means that the Test Chamber is short of water.
●Open the red valve of the water inlet (please pay attention to the direction of rotation, otherwise it will be broken), and slowly add the prepared pure water into the funnel. Due to the small caliber, the underwater flow rate is slow, please be patient and add slowly. Until the pressure tank low water level indicator light goes out, the pressure tank water level has risen.
●Adding water to the sealed Water Tank: Add an appropriate amount of pure water to the Water Tank around the cover of the salt spray cabinet to prevent the salt spray from leaking from the surrounding when the instrument is working.
●It is recommended that each bottle be equipped with 500g of analytically pure sodium chloride for the preparation of the test solution. Saline Mixing and Infusion
●Take out 9500ML pure water from our 5000ML anti-rust plastic bucket, pour it into a larger clean plastic bucket, add 500g of analytically pure sodium chloride, and stir until completely melted. The brine concentration ratio at this time was 5%.
●Slowly pour into the "reagent port". At this time, the brine will gradually flow into the brine preheating tank in the Test Chamber.
●For analytically pure sodium chloride of other quality, please follow the concentration of 5%. Than configure
●During the operation of the salt spray chamber, there may be a water shortage alarm in the laboratory and pressure tank, reminding us to replenish water in the corresponding parts of the instrument in time. The instrument will automatically stop working after the water comes out to protect the instrument itself.
●Please turn off the "Operation" button during the watering process. The watering method is the same as above. After the water level is filled (all low water level indicators are off), the "Run" button lights up and starts working again. Since our time relay has an automatic power-off memory function, please don't worry that the previous test time will be cleared.
●When the saline is lost, we need to open the small cover of the "reagent inlet" for observation. If the brine is lost, redistribute the brine and make sure to keep it on during work.
●The position of the sample in the salt spray chamber during the test should meet the following conditions:
●Before the test, it is necessary to carry out visual inspection and other performance tests on the test samples according to the relevant standards. The surface of the sample needs to be clean, free from oil stains, and without temporary protective layers.
● Unless otherwise specified, the specimen shall be supported or suspended at an angle of 15 to 30° to the longitudinal direction, and it is recommended that the majority of the surface to be tested be parallel to the main flow of the salt spray through the chamber.
●The specimens should not be in contact with each other, nor with any metallic material or any material acting as a fuse.
● Each sample should be in an unobstructed position in contact with the salt spray.
• The salt solution from each sample must not drip onto another sample.
●Control the internal temperature of the Test Chamber (pressure tank), press "<" to move to the number to be adjusted. At this time, a small dot will flash in the lower right corner of the adjustment number. Press "△" or "▽" to adjust the size of the number. temperature, time setting
●Set the laboratory temperature to 35 degrees Celsius
●Set the pressure pot temperature to 47 degrees Celsius
The temperature control meter can be used to set the temperature as follows: In the initial screen, long press the "<" key, wait for the screen to change, press the "▽" key to switch to "ON", then press the leftmost circle key to confirm, wait for the temperature to self-adjust, the screen will stop blinking automatically.
●Stop setting, long press "<" key, then press "△" to switch to "OFF". close it.
● There are two timers on the panel, located below the temperature control table. The timer on the left is the time of the test. The setting method is to switch modes. Salt spray test is usually in hours (h). We will calculate the left side. The time unit of the device is set to "0.1h". For example, if we want to set a 72-hour test, then we will dial the first four digits of the time unit as: 0720; the timer time is the main reference parameter for our test.
●In the above operation, we turned on the "Power" and "Operation" buttons, added the water level, placed the sample, and set the temperature and time. At this time, we can turn on the "spray" and "time" buttons, and the salt spray machine will officially enter the working state. Switch button description:
●After the test time is over, the instrument will automatically shut down, and the "End" indicator light will be on. After the salt spray has completely settled, the samples can be taken out for subsequent testing and comparative analysis.
●If the salt spray chamber will not be used for a long time, please turn off all switch buttons, and drain all the water in the salt spray machine, including the Test Chamber, pressure tank, brine room and sealed Water Tank.
Salt spray Test Chamber maintenance
●Post-test treatment: After the spray test is completed, when opening the top cover of the test box, do not drop the solution carefully, and take out the sample carefully. Do not damage the main surface, quickly wash off the attached salt particles with water below 38°C, use a brush or sponge to remove corrosion products other than corrosion points, and immediately blow dry with clean compressed air.
●Laboratory drainage: open the red drain valve in the picture (viewed from the back, located at the lower right corner of the back of the machine). drain
●Pressure tank drainage: Located at the bottom of the electrical box, there is a copper valve, and a basin or other lower edge container is placed below to drain the waste water from the pressure tank (at least once every 15 days).
●Tank Drainage: Remove the silicone plug from the picture, the salt water will be drained directly from the rear drain. located below the spray tower
●The maximum pressure of the pressure regulating valve after the salt spray chamber is 2.5kg/cm2 (generally 2.0kg/cm2). Do not adjust the pressure too much or you may damage the pipe. maintain
●The maximum pressure of the front pressure regulating valve is adjusted to 1.5kg/cm2 (generally 1.0kg/cm2), if the pressure is too high, the pipeline will be damaged.
●If there is automatic watering, you need to turn off the manual watering switch. After adding water, you need to close the pressure tank, otherwise the water in the pressure tank will be sprayed out from the manual water filling port.
●Pay attention to whether the brine tank is short of water. If you find that the brine tank is short of water, add brine immediately.
●Do not leave the salt spray chamber outside and avoid direct sunlight.
●Please handle the salt spray chamber you ordered with care.
●If the nozzles are discontinuous or the amount of spray is insufficient, please check whether the air pressure is normal; check whether the small holes in the front section of the two glass tubes of the nozzle are in a line; check whether the nozzles are unblocked.
●Please clean the salt spray chamber once or twice a month to ensure that the salt spray chamber is clean and reduce test errors. Ensure that the water in the pressure tank is cleaned at least every 15 days.
●Place the collecting funnel horizontally to collect samples accurately, and pay attention to drop the water droplets attached to the tube wall and funnel into the measuring cylinder to minimize the test error.
●When the salt spray chamber is not used for a long time, be sure to drain all the water in the salt spray chamber.
●The electric board is made of precision electronic components, which prevents water, salt water or other liquids from entering the interior. It is recommended to seal the gap around the electrical box.
●Clean the scale generated on the heating tube of the Test Chamber frequently to prolong the service life of the heating tube.
●Check water shortage, water shortage, please make up the temperature of the Test Chamber or pressure tank is not heated. troubleshooting
●Whether the heat pipe burns, replace the heat pipe, and contact us.
●Relay failure, contact the supplier of Wewon Environmental Chambers Co., Ltd.
●Pay attention to the time unit, a time unit will jump once and the timer will not work
●Lack of water in the laboratory or pressure tank. Please replenish water in time when there is a shortage of water
●If there is no display at all, please contact the supplier of Wewon Environmental Chambers Co., Ltd.
●In the state of spraying, please check whether the pressure gauge has pressure. If the gauge is pressurized front and back, the nozzle is clogged, remove the nozzle, clear the nozzle from the nozzle with a thin copper wire, use the air source from the nozzle tip. Blow until the clog is cleared or replace the nozzle directly. Since the nozzle is made of quartz glass, handle it with care! Salt spray chamber does not spray
The salt Water Tank is short of salt water, add salt water
●If there is pressure on the rear pressure gauge, and there is no pressure on the front pressure gauge after turning on the "spray" button, please contact us.
●The temperature control meter is damaged, replace the temperature control meter. Sat spray chamber (pressure tank) does not reach the set temperature
●The heat pipe is damaged, replace the heat pipe
●The water level device is damaged, replace the water level.
●The temperature of the thermostat in the laboratory (pressure tank) is lower than the ambient temperature
●The temperature setting of the laboratory safety protection switch is too low
●Salt spray chamber controller failure