Search
    Cart(0)
      总价
      前往结算
      您的购物车是空的 : )

      This standard provides a protocol for verifying the performance of new Xenon-arc test equipment to ensure that the equipment can perform the tests specified in SAE J 1885, SAE J 1960, SAE J 2412, SAE J 2527, etc. The standard provides verification procedures for contractors to confirm that the performance of the test equipment meets requirements. This protocol applies to the performance calibration of new Xenon-arc test equipment to ensure the accuracy and Reliability of the equipment in practical applications.

      This summary is not the original standard text and is for reference only. For accurate information, please obtain it through official channels.
      Status Active
      CCS ICS
      Release Date Implementation Date
      0 in total
      filter
      Featured Hot Price Time
      Focus on online sales of Lab Testing Instruments