"GB/T 3386.2-2007 Electric and Pneumatic Analog Drawing Recorder for Industrial Process Control System, Part 2: Guidelines for Inspection and Routine Testing" specifies the inspection and routine testing requirements for this type of recorder. The standard specifies the items, processes and methods of inspection and routine testing, covering Appearance, performance, safety, etc., standardizes the mass testing of instruments in industrial process Control systems to ensure stable product performance and reliable operation, and provides guidance for mass control and use maintenance of equipment production.
This summary is not the original standard text and is for reference only. For accurate information, please obtain it through official channels.
| Status | Active | ||
|---|---|---|---|
| CCS | N14 | ICS | 17.220.20 |
| Release Date | 2007-11-14 00:00:00 | Implementation Date | 2008-05-01 00:00:00 |